Floor Addition

Floor Addition

Centraide of Greater Montreal


Type: Construction Management

Project Date/Period: 2006-2007

The addition of a floor on an existing building and the upgrading of the building were conducted to increase office space. The expansion yielded 7,000 square feet of space and required the addition of a stairwell accessing 5 floors, as well as the replacement of two elevators. Work was performed in fast-track mode while the building was kept in operation; plans and specifications were prepared concurrently with construction activities (3 months for the preparation of plans and specifications and 6 months for construction work).