Le Tremplin School for Handicaped Children

Commission Scolaire Marie-Victorin


Type: Fixed-Price Project

Project Date/Period: 2007

QMD was mandated for the expansion and the redevelopment of an existing building into a new secondary school for handicapped children. Redevelopment was performed on an area covering 18 600 square feet, and the expansion of two floors (34 400 square feet). Work included fitting a swimming pool, a gymnasium, a cafeteria, classrooms, all adapted to the specific needs of the children. The project was implemented over a period of 35 weeks.

  • Le Tremplin 001
  • Le Tremplin 002
  • Le Tremplin 003
  • Le Tremplin 004
  • Le Tremplin 005
  • Le Tremplin 006
  • Le Tremplin 007
  • Le Tremplin 008
Previous Next